VERONA FIERE SPA

Verona Fiere Spa

REDEVELOPMENT OF THE MARKET GALLERIES OF THE VERONA FAIR

Verona

Assistance in the executive design of mechanical and electrical installations / Electrical and mechanical systems Works management / Testing.

The building has historical and monumental restrictions for different architectural aspects, which limit the possibility of intervention.

Due to the nature of the building used as a market for fruit and vegetable space, the building was not previously heated. So several different operating scenarios were hypothesized.

NEWS - BLOG

Hai bisogno di professionisti per affiancarti
nella progettazione e nella costruzione?

Offriamo professionalità e competenza per facilitare il tuo lavoro.