CONSTRUCTION OF A NEW INDUSTRIAL SITE FOR THE DAIRY INDUSTRY

Villafranca di Verona

Electrical and mechanical systems preliminary design / Electrical and mechanical systems executive design/ Project management and coordination of all engineering disciplines involved / works management / BIM method application on all disciplines involved.

Dabster is working on the design and construction of a new industrial building for milk whey processing. The building requires an electrical system with a total electrical output of 3000 kW, includes a 2.7 MW co-generator and steam boilers with a total output of 16000 kg/h. The project was developed with BIM technology for both the architectural and plant engineering parts.