Each site is designed to meet local energy needs through an integrated production and consumption system, optimized to reduce environmental impact and operating costs.
Main data of the designed plants:
- Photovoltaic of about 1 MWp per site
- 400 kW electric and 482 kW thermal cogenerator
- 200 kW thermal biogas boilers
- MT/BT cabins and electrical distribution systems dedicated to process loads
The energy analysis showed an annual production of more than 2.9 million kWh, with a percentage of self-consumption greater than 88% for photovoltaic and more than 98% for cogeneration. This approach guarantees efficiency and sustainability, with a monitoring system that allows you to optimize performance in real time.