The intervention involved the design and complete renovation of the air conditioning system of a building that covers an area of more than 12,000 square meters, with the installation of 226 new fan coils and using more than 10,000 meters of pipes.
The works were carried out without ever blocking the activity of workers and visitors inside the offices of the Europe Quadrant, the second center for the exchange of goods and logistics on the continent.
Dabster developed the preliminary and executive design of the mechanical systems.