Zai Consortium

Air conditioning system requalification

Design and renovation of the 12,000 square meter air conditioning system in the European Quadrant, with 226 new fan coils and more than 10 km of pipes.
Zai Consortium
The intervention involved the design and complete renovation of the air conditioning system of a building that covers an area of more than 12,000 square meters, with the installation of 226 new fan coils and using more than 10,000 meters of pipes.

The works were carried out without ever blocking the activity of workers and visitors inside the offices of the Europe Quadrant, the second center for the exchange of goods and logistics on the continent.

Dabster developed the preliminary and executive design of the mechanical systems.
Place Verona
Typology Directional
Anno 2020
State Completed
sizes 12.000 MQ
Customer Zai Consortium
Activity Mechanical system design