Dabster
Who we are
Values
Team
Certifications
Business Unit
Design and Works
Consultancy and Technical Studies
Project Management
Sustainability and Energy
Industries
Projects
Highlights
Customer Service
Contacts
Work with us
Choose your country
linkedin
linkedin
Press
ENTER
to search or
ESC
to exit
Dabster
Who we are
Values
Team
Certifications
Business Unit
Design and Works
Consultancy and Technical Studies
Project Management
Sustainability and Energy
Industries
Projects
Highlights
Customer Service
Contacts
Work with us
Projects
>
Leonardo Da Vinci Primary School
Leonardo Da Vinci Primary School
Energy upgrading
Thermal coating application, new windows and LED lighting have reduced energy consumption and CO2 emissions, with savings of 29% on methane and 44% on lighting.
Executive design of mechanical and electrical systems. Executive design of building components for savings
The study: The application of the thermal coat and the replacement of the windows reduced the thermal requirement required for heating by 24%, thus leading to a drop in methane consumption by boilers. Lower fuel consumption has resulted in both savings in economic terms and savings in terms of CO2 produced, reaching 37399 Kg/year (-29%). By replacing the existing lamps with the LED lamps provided for by the project state, there has been a reduction of 31% in the electricity requirement for artificial lighting. This has led to both a decrease in the expenditure related to the acquisition of electricity from the grid and a decrease in the CO2 emitted, given that part of the energy present in the network is still generated through non-renewable sources. The decrease in CO2 linked to the transition to the new lighting system amounts to 9513 Kg/year (-44%).
Place
Bussolengo (VR)
Typology
Formation
Anno
2018
State
Completed
Customer
Leonardo Da Vinci School
Activity
Building design and mechanical and electrical systems.
Directions
displays on google maps
cancel
Directions
Other Projects
All projects
Architectural Lighting of a Historic Villa: The Art of Enhancing Heritage
PARIZÙ Verona: Plant Engineering for catering in the historic center
E. Salgari School Redevelopment: Engineering for Safe and Sustainable School Buildings
Utility-scale BESS hub: integrated engineering and permitting for more than 850 MW of national storage
Upgrading Manufacturing Hub
Integrated Residential Regeneration in Castelnuovo del Garda
Contact us
Do you have questions or need assistance? We are here to help.
We will reply as soon as possible!
Contact us