Press ENTER to search or ESC to exit
As part of the expansion of the San Giovanni Lupatoto production area, Dabster was responsible for the executive design of the entire plant part. Specifically, Dabster designed the new production line, the new cell at the service of shippers, the new sorted cell with a water treatment system for washing the cell itself and the new ammonia refrigeration unit with a power greater than 1000 kW. She was also responsible for the refurbishment of the company's store plants and the refurbishment of the water dosing line for food
Finally, Dabster provided the construction management of the electrical and mechanical systems, energy consultancy, the drafting of the final “As Built” drawings and the executive design of the underground