Expansion of production plants

Design and construction management of mechanical and electrical systems for the expansion of the plant and the new technological hub.
Pastificio Rana industrial building

Starting from the unused portion of the existing plant, the building has been expanded. The body of the building thus created was equipped with basic mechanical and electrical systems (lighting, smoke control, driving force, ventilation, air conditioning, sanitary water) and

at the service of the production departments:
  • Specific air conditioning and ventilation for the various departments
  • High pressure washing system
  • Hydrant and sprinkler network
  • Technical fluids (glycol water, ammonia, softened water, osmosis, 10 bar steam, 5 bar steam, domestic hot water, domestic cold water, recirculation, heating hot water, thermal oil) and related control and control groups
  • Control and supervision systems (SCADA)
  • Technological plants for the production and distribution of fluids: 4,000 kW refrigerators, 2,000 kW thermal, 10,000 kg/h steam,
  • New 6,000 kVA electric cabin with related power center
  • Power distribution panels, technological panels and production lines
Place Moretta (CN)
Typology Industrial
Anno 2019
State Completed
Customer Pastificio Rana
Activity Design of mechanical, electrical, fire-fighting and special systems
Bim Bim
The new technological hub is also under construction, containing:
  • Thermal power plant for thermal oil
  • Compressed air power plant
  • Water treatment plant
  • Ammonia refrigeration system upgrade
  • New medium voltage electric cabin