The project involved the redevelopment and plant adaptation of the 3 branches in Bussolengo (VR), Flero (BS), Tolmezzo (Ud), Udine and Verona and 1 office building.
The main need of the Client was to keep the branches and offices in operation at all times during the renovation phases. Therefore, this particular need had to be taken into account during the design and construction of electrical and mechanical systems.