Dabster
Who we are
Values
Team
Certifications
Business Unit
Design and Works
Consultancy and Technical Studies
Project Management
Sustainability and Energy
Industries
Projects
Highlights
Customer Service
Contacts
Work with us
Choose your country
linkedin
linkedin
Press
ENTER
to search or
ESC
to exit
Dabster
Who we are
Values
Team
Certifications
Business Unit
Design and Works
Consultancy and Technical Studies
Project Management
Sustainability and Energy
Industries
Projects
Highlights
Customer Service
Contacts
Work with us
Projects
>
Verona Fiere offices
Verona Fiere offices
Restructuring of the head office
Executive design for the renovation of the air conditioning system of the Veronafiere office building, with new fan coils, 4-pipe thermoregulation and distribution system.
Executive project for the
renovation of the air conditioning system
serving the office building of the Veronafiere Authority. The project involved upgrading the indoor air conditioning units with the replacement of existing cabinet fans and the insertion of 4-way boxes in indoor meeting rooms or in the most crowded rooms.
The intervention also involved equipping the new fan coils with control valves and digital thermostats capable of communicating with the general supervision system of the exhibition center so as to be able to manage their switching on, turning off, attenuation and optimizing energy consumption.
In addition to fan convectors and thermoregulation, the thermal
fluid distribution pipes have been replaced in order to adapt the thermal
insulation and to be able to manage the thermal loads of the meeting rooms optimally even in winter with a 4-pipe system.
Place
Verona
Typology
Directional
Anno
2019
State
Completed
Customer
Verona Fiere S.P.A.
Activity
Mechanical system design
Directions
displays on google maps
cancel
Directions
Other Projects
All projects
Architectural Lighting of a Historic Villa: The Art of Enhancing Heritage
PARIZÙ Verona: Plant Engineering for catering in the historic center
E. Salgari School Redevelopment: Engineering for Safe and Sustainable School Buildings
Utility-scale BESS hub: integrated engineering and permitting for more than 850 MW of national storage
Upgrading Manufacturing Hub
Integrated Residential Regeneration in Castelnuovo del Garda
Contact us
Do you have questions or need assistance? We are here to help.
We will reply as soon as possible!
Contact us